Free sample kit for qualified distributors — MOQ from 200 m².

Plastic wall formwork panels assembled on site

Heavy-Duty Plastic Formwork
Built for Real Projects

Modular plastic panels that assemble like building blocks. Reusable 60–100 times, with a concrete finish straight from the mould.

Lighter Panels.
Faster Cycles.

One panel weighs about 14 kg per square metre — crane time drops. Fewer workers per cycle, faster stripping, no oiling and no patching.

Formwork moulds in production at the Shanghai plant

One Choice,
Lifetime Service.

Spare panels, frames and accessories for the life of the system. Or send us a drawing and we will engineer a mould for your project.

  • Factory-direct pricing
  • Ready to ship in 15 days
  • On-site assembly support
  • One-year guarantee

Shop by system

Formwork Systems

Built And Delivered

All Projects

Still true after 80 pours

We ran the same wall panels on eight floors of a residential tower. The face is still flat and the frames have not racked at all.

Li Wei · Site Engineer Wall System · Shanghai

Stripping time cut in half

The panels are light enough that two workers handle a full panel, and there is no oiling step at all. Our cycle time dropped noticeably.

Omar H. · Formwork Contractor Column & Beam · Dubai

Cheaper than steel over the cycle

We compared the whole-life cost against steel for the same wall area. With the reuses we are getting, plastic came out clearly ahead.

Daniel R. · Procurement Manager Wall System · Berlin

Culvert sections came out clean

The corridor moulds arrived complete with the accessories and the sections came out with a surface we did not need to patch.

Arun P. · Project Manager Civil Works · Singapore

No oiling, no patching

The release agent we used to buy every month is simply not needed any more, and the finish quality is far more consistent.

Marta K. · Site Supervisor Cylindrical · Warsaw

Accessories arrived complete

Every handle, pin and tie we needed came in the same shipment. Nothing held up the first pour.

Carlos M. · General Contractor Wall System · Santiago

Custom moulds in four weeks

We sent drawings for a non-standard shaft section and had the mould in hand in under a month. The fit was right first time.

Yusuf A. · Technical Director Custom · Istanbul

Built To Last
Proven On Site

A formwork system only earns its place when it survives a full floor cycle without repair. So every batch is tested for impact, deflection and stripping before it ships.

Our Story
Inside the Doan factory — plastic formwork production line
  • 30+ Countries

    Formwork shipped to contractors and distributors in 30+ countries.

  • Most Reordered System

    The wall system is the item clients come back to season after season.

  • 12,000 m² / Month

    Two ISO 9001 certified production lines in Shanghai and Jiangsu.

  • 60–100 Pours Per Panel

    Verified turnover with normal maintenance and correct stripping.

  • ISO 9001 & CE

    Material certificates and test reports supplied with every batch.