Free sample kit for qualified distributors — MOQ from 200 m².

Quality Metrics Dashboard

The industry benchmark, defined by data. We continuously monitor key quality indicators to ensure consistent excellence.

99.8%
First-Time Quality
Industry Top
0.17%
Defect Rate
-12% YoY
0.32%
Return Rate
-8% YoY
99.3%
Supplier Quality
+5% YoY

The 27-Point Inspection Protocol

Shanghai Doan's exclusive Quality Agreement Whitepaper. These 27 radically transparent, industrial-grade inspection points are our ultimate commitment to every B2B partner.

STEP 1

Raw Material Verification

Incoming PP / ABS virgin resin is checked for melt flow index, purity and absence of regrind contamination.

Pass Rate: 99.7%Critical Priority
STEP 2

Impact Modifier Ratio Testing

Verification that impact modifiers and UV stabilisers fall within the engineered 6-8% range for optimal durability.

Pass Rate: 99.9%High Priority
STEP 3

Panel Abrasion Testing

Taber abrasion testing to confirm surface wear resistance exceeds 30,000 cycles under site conditions.

Pass Rate: 99.5%High Priority
STEP 4

Steel Frame Quality

Verification of Q235 steel frames through tensile strength testing and full weld-seam examination.

Pass Rate: 99.8%High Priority
STEP 5

Hardware Quality Check

Inspection of all pin, wedge and clamp components for specification, finish and corrosion resistance.

Pass Rate: 99.9%Medium Priority
STEP 6

Bond Strength Testing

Verification of panel-to-frame bonding through shear and pull-out testing at ambient and elevated temperature.

Pass Rate: 99.6%Critical Priority
STEP 7

Dimensional Accuracy

Precision measurement of every panel to ensure conformance within a ±0.5 mm tolerance band.

Pass Rate: 99.8%High Priority
STEP 8

Joint Integrity Testing

Verification of all interlocking joints for proper alignment, clearance and locking force.

Pass Rate: 99.7%Critical Priority
STEP 9

Load Capacity Testing

Load testing of wall and column panels to verify they exceed the rated pouring pressure by 50%.

Pass Rate: 99.9%Critical Priority
STEP 10

Stiffness & Deflection Testing

Deflection testing under full hydrostatic head to confirm panels meet anti-deformation standards.

Pass Rate: 99.8%Critical Priority
STEP 11

Assembly Verification

Confirmation that every component assembles correctly according to the approved shop drawing.

Pass Rate: 99.6%High Priority
STEP 12

Fastener Torque Check

Verification that every tie-rod, pin and wedge is tightened to the specified torque value.

Pass Rate: 99.9%Medium Priority
STEP 13

Surface Finish Quality

Visual and tactile inspection of every panel face for flatness, consistency and absence of defects.

Pass Rate: 99.5%High Priority
STEP 14

Edge Treatment Verification

Confirmation that all edges are chamfered and sealed for safe handling and best release performance.

Pass Rate: 99.7%High Priority
STEP 15

Release-Agent Durability Testing

Repeat-pour testing to confirm the release coating withstands the specified number of casting cycles.

Pass Rate: 99.6%Medium Priority
STEP 16

Colour Consistency Check

Verification that all coloured components match the approved colour standard within tolerance.

Pass Rate: 99.4%Medium Priority
STEP 17

Concrete Finish Inspection

Trial panel casting to confirm the resulting concrete surface meets the specified finish class.

Pass Rate: 99.5%High Priority
STEP 18

Reinforcement Inspection

Examination of reinforcing ribs and frames for correct placement, coverage and weld quality.

Pass Rate: 99.7%High Priority
STEP 19

Sharp Edge Detection

Comprehensive inspection for sharp edges, burrs or protrusions that could pose handling hazards.

Pass Rate: 99.9%Critical Priority
STEP 20

Tipping Risk Assessment

Stability testing of assembled panel stacks to ensure units meet anti-tipping standards.

Pass Rate: 99.8%Critical Priority
STEP 21

Chemical Safety Testing

Verification that all materials and coatings meet or exceed standards for VOCs and toxicity.

Pass Rate: 99.9%Critical Priority
STEP 22

Entrapment Risk Check

Inspection for gaps or openings that could trap fingers or tools during assembly and stripping.

Pass Rate: 99.9%Critical Priority
STEP 23

Small Parts Verification

Confirmation that all pins, wedges and clips are securely attached and accounted for in every set.

Pass Rate: 99.8%Critical Priority
STEP 24

Fire Safety Testing

Verification that all materials meet fire-resistance standards appropriate for construction site use.

Pass Rate: 99.9%High Priority
STEP 25

Packaging Integrity

Verification that packaging protects the panels across the specified shipping and handling route.

Pass Rate: 99.7%Medium Priority
STEP 26

Documentation Verification

Confirmation that safety notices, assembly drawings and test certificates ship with every order.

Pass Rate: 99.9%Medium Priority
STEP 27

Final Visual Inspection

Comprehensive final review by a senior quality control specialist before shipping approval.

Pass Rate: 99.8%Critical Priority

Quality Control Team Structure

Our dedicated team of quality specialists works collaboratively to ensure every product meets our exacting standards before reaching our customers.

Plastic formwork modules staged for final quality inspection
15
QC Inspectors
8
Lab Technicians
40+
Annual Training Hours
8+
Years Avg. Experience

Led by a Director, our fully certified team holds ASQ CQE and Six Sigma qualifications — ensuring every inspection meets world-class manufacturing standards.

Latest News

Stay Updated

Get early access to new formwork systems, technical guides and project case studies from our engineering team.